Case studies
Scale

Learnquay

A Bubble learning platform migration that kept progress and certificates meaningful

  • Scale
  • Professional education
  • Bubble

18days

Delivery

100,000/100,000

Progress reconciliation

40/40

Entitlement suite

0

Repeated completion events

Illustrative before/after figures.

The product

Learners opened enrolled courses, consumed lessons and recorded completion. Instructors maintained lesson order; administrators managed enrolments and certificates. The product contained 1,000 lessons, with video and billing supplied by existing services. A certificate reflected the completion policy in force when it was earned. Course access, progress and earned completion were related but distinct parts of the product.

The challenge

The story began with completion percentages that were difficult to explain after content edits. Reordering or adding a lesson could change what a current percentage meant without changing the learner's historical work. Discovery reconstructed the completion rules with education staff before selecting a migration. The rebuild served the need for owned, testable rules; it was not a promise that a new stack would improve educational outcomes.

The course owner was receiving messages from returning learners whose progress no longer matched the lesson list after content edits. A certificate could refer to a different course version than the one completed. The project therefore preserved learning history before improving presentation. We separated lesson identity, course version, completion and entitlement, and used returning-learner scenarios as the acceptance path. Video hosting and new learning features stayed outside the rebuild.

How we tackled it

  1. 01

    Define completion. We separated course entitlement from lesson events and documented the policy behind each certificate.

  2. 02

    Preserve context. Progress records retained lesson and course-version identity so later edits could be interpreted correctly.

  3. 03

    Make saves repeatable. Repeated completion requests returned one logical event rather than inflating progress.

  4. 04

    Validate history. Complete, partial and inactive enrolments were compared against approved reference calculations before the final migration.

What we built

Next.js, TypeScript and Tailwind implemented learner and staff screens. Postgres with Drizzle stored course versions, enrolments and progress events. Managed authentication preserved the roles. Existing media and billing providers kept their authority. A worker generated certificates and notifications already included in the product. Private materials required an entitlement check, while public course descriptions could be served independently.

The rehearsal compared event identity, timestamps and derived completion rather than only displayed percentages. Tests covered repeated saves, cancelled access and a learner returning to a modified course. Progress writes paused for the final delta and representative enrolments were accepted before general access. The recovery guide preserved events generated after the snapshot, preventing a rollback from simply discarding recent study work.

Before & after — illustrative results

The illustrative performance result measures opening an authorised lesson shell under 40 concurrent learner sessions. External video transfer is outside that boundary. The retry comparison evaluates 1,000 repeated-event pairs and checks final completion state. Progress reconciliation verifies learner and lesson relationships under approved version rules. Better retention or a higher course-completion rate would need real cohort evidence and is not asserted by this story.

Illustrative before/after values. No tests or client measurements were performed for this story. The comparison conditions describe how an equivalent real migration would be evaluated; they are not a test report.

MetricBeforeAfterComparison conditions
Progress reconciliation100,000 source events100,000/100,000 reconciledVerify learner, lesson, timestamp and version-aware derived completion.
Entitlement suite34/40 defined checks pass40/40 passExpired access, cancelled membership, role boundaries and direct requests.
Repeated completion events63 duplicate completions in 1,000 retry pairs0 duplicate completionsRetries before/after acknowledgement; inspect final state.
Lesson-shell response, p951,700 ms570 ms — 66.5% lower40 learners, 20 minutes; external media transfer measured separately.
Investigate a learner progress question, median16 min5 minTwenty course-version and duplicate-event scenarios; same support operator; final progress must match the accepted event history.
Lesson-page LCP, lab p754.4 s1.9 s — 2.3× fasterTen fixed lesson shells; 40 loads each; same mobile/network profile; external video startup excluded.

The outcome

Learnquay ended the example with a stable explanation for prior progress and a documented process for future course edits. The receiving team could change a test course without losing the meaning of historical certificates. Handover included the completion glossary and a progress restore exercise. The commercial lesson is that an LMS migration should preserve what learners have already earned, not just the pages they visit.

Why these improvements mattered

Support staff could inspect a versioned progress trail instead of resetting a learner blindly. Separating the lesson shell from externally hosted media improved initial rendering, while the reconciled history protected continuity. The example does not claim a higher completion rate or improved educational outcomes.

Scope & timeline

Scope

Scale included the course catalogue, enrolment, lesson access, progress and existing certificate process. Bubble to Code delivered version-aware mappings, an acceptance sample of returning learners and provider-reference documentation. Video hosting and billing remained in place. New assessments, live classrooms and recommendations were excluded. The boundary kept the project focused on continuity for existing learners rather than a simultaneous redesign of the learning product.

Delivery timeline

Delivery schedule: 18 working days. Team: Two engineers, shared QA and the learning operations owner. The clock starts after scope approval, usable source data, test access and agreed UI are available. Waiting for external approvals is excluded. This is a bounded example, not a turnaround guarantee.

Days 1–3: agree versioned progress and entitlement rules.

Days 4–11: rebuild course access, completion and certificates.

Days 12–16: reconcile events and rehearse returning-learner journeys.

Days 17–18: switch the catalogue and transfer support diagnostics.

FAQ

Can course progress survive a Bubble LMS migration?
Yes, if events, lesson identities and the rules used to derive completion are mapped and reconciled explicitly.
Do videos and billing have to move too?
Not necessarily. Retaining established providers can keep the migration focused on enrolment, progress and the application experience.

Discuss a similar migration

Bring a completed course that later changed and a disputed progress record. Bubble to Code can define the completion policy and learner-level acceptance sample for a Scale migration. Establish what must remain historically true before introducing new educational features.